REMOVES
CORROSION AND BAKED-ON LIGHT SCALE DEPOSITS FROM HEAT
EXCHANGERS
WORKS
DURING NORMAL SYSTEM OPERATION WITHOUT REMOVAL OF
BOILER OR PIPING
MAY
BE LEFT IN THE SYSTEM
Some
heating systems can be susceptible to noise problems
as a result of baked on corrosion and limescale deposits
on boiler heat exchangers.
Whilst
power flushing may cure this, on some systems it
may be an ongoing problem. Addition of one litre of
SYSTEM-HUSH,
together with the SYSTEMSAFE-DM,
is recommended to cleanse the heat exchanger during
normal system operation. SYSTEM-HUSH may be left in
the system without draining.
SYSTEM-HUSH
works at a near neutral pH, taking rust, corrosion
and light scale deposits into solution, without formation
of particulate matter to cause blockages and damage
pumps. Boiler heat transfer surfaces are left clean, restoring
efficiency, and boiler noises are eliminated.
SYSTEM-HUSH
may be used with all metals commonly used in heating
systems, including ferrous metals, brass, copper, aluminium
and galvanised steel. It does not cause deterioration
of metallic or non-metallic components when used as
recommended, enabling it to be used on older systems which
maybe in too poor a condition for aggressive descaling
chemicals.
The
self-neutralising and passivating properties of SYSTEM-HUSH
remove the need for time consuming flushing procedures
after use,and metal surfaces are left clean and corrosion
free.
Application & usage:
One
litre of SYSTEM-HUSH is sufficient to treat a typical
central heating system of 100 litres capacity (approx
10 radiators).
If
the system water is very dirty and heavily discoloured
(indicating the presence of sludge and large quantities
of black iron oxide corrosion deposits throughout
the heating system), first drain and flush the system
with HYPER-FLUSH flushing
treatment.
To
ensure that all SYSTEM-HUSH enters system, add to
the feed and expansion tank after isolating water supply
and draining off 15 litres (3 gallons) of water.
Allow the system to refill. Alternatively, the SYSTEM-HUSH
may be injected directly into a radiator using a SYSTEMSURE
Injector.
The
heating system should be operated normally while
the SYSTEM-HUSH is working, which may take 2-3weeks for
full effect. SYSTEM-HUSH may be left in the heating
system after the cleaning process. It is not necessary
to drain and refill after treatment, although the
operator may wish to do so if the system water in the
feed and expansion tank is still heavily discoloured
by corrosion residues in the radiator and pipes.
In
either case, SYSTEMSAFE-DM scale and corrosion inhibitor
should be added to the system after the operation
to prevent further scaling or corrosion.